Thursday, April 23, 2015

Flintstone Project - Stage 1

2014 PROJECT: Complete Floor Replacement
           October through December 2014

     Materials Used:
         CJ Pony Parts:
                Complete floor kit - Here 
                Firewall insulation - Here
                Ford blue carpet - Here
                Right side torque box - Here              
                Eastwood's seam sealer (qty 4) - Here
   
         Locally:
                Primer, black spray-paint & rust stop (Ace Hardware)
                Welding rods, gas & wire (local welding/hardware supply shop)

     Cost: $720.00 + welding wire & gas, primer & paint plus a lot of time

     Helpful Websites:
     VERY HELPFUL - 67txstang.blogspot.com
     67 Fastback Resto
     Various You Tube videos & online website searches


Going into the dungeon - 



Removing the back seat and taking out the carpet





Front passenger side




Removed the passenger seat




Severe damage on the drivers side

.


Cleaning up the back




Cleaning up behind the drivers seat





Cutting out sections of rust behind seat (driver side)





A lot of work needing to be done!



Wednesday, April 22, 2015

Flintstone Project - Stage 2

After much work, cutting out the floor, the driver's side floor is almost ready.


Behind driver's side seat




Removing the under the back seat floor pan section.
Thankfully the inner rocker panel looks great without any permanent rust damage.



Ready for fitting the new floor.

Tuesday, April 21, 2015

Flintstone Project - Stage 3


Fitting in the rear floor extension

Welding in the passenger side rear floor extension.




Austin & Daniel helping me out
Welding & grinding.
Yes, those are my pink earmuffs he is wearing.


Welded in




Tacking the toe-board into place.

Welding a torque box to the frame on the passenger side for strength. We had to take the torque box apart to be able to manipulate it in. We were not able to get it lined up perfectly with the floor slope on the back side, but it was close. 1967 coupe mustangs only came with torque boxes on the drivers side. Ford later added them to both sides. 





Fitting & welding in the driver side floor pan.



Bringing in the passenger side floor pan.


After MUCH work the floor is finally IN.



Rear floor extensions.




Placing, welding & painting the new seat platforms in. 




Monday, April 20, 2015

Flintstones Project - Stage 4

- The Final Details - 



                                                                                           The final coat of paint.

                                            

Installing the new carpet





Re-installing the back seat.








Re-installing the front seat



The finished product.